Installed since 2015. The pre-fabricated members are carried onto the passenger bum boat for delivery and hand carried to site of installation.
Design Prototyping in LGS
Installed since 2015. The pre-fabricated members are carried onto the passenger bum boat for delivery and hand carried to site of installation.