Indoor

Temporary Protection Mezzanine

In this project, we installed temporary protection to a range of high-end laboratory equipment that was calibrated and cannot be moved during the redecoration. Our structures serve as the support for scaffolding to be erected for painting works to the high ceiling. More info on the equipment and facility

Read More »

Robotics Platform

Our structures were used to build the infrastructure for robotics training at Hai Sing Catholic School. Lightrus structures include: – Elevated Platform – Movable Work Stations Heartiest congratulations to Mr Teo Yee Ming for this amazing achievement!

Read More »

Oxley BizHub

Mezzanines can be installed in spaces with high ceilings to increase usable space. We are able to design and manufacture lightweight mezzanine structures without exceeding the allowable floor loading capacities. Durability We use LGS technology to manufacture engineered steel sections that are used in the mezzanines. This ensures a long service life[…]

Read More »

Solar Panel Stand

Specially designed for exhibiting this high efficiency solar panel during Switch event in Marina Bay Sands.

Read More »

iLights 2016

Part of iLights Marina Bay 2016, this truss structure was designed to present NTU School of Art, Design and Media’s installation. Ode to the Wind uses digital algorithms to create a dynamic light installation that  uses numerous wind datasets to enable users to observe visualizations fo tr wind in one[…]

Read More »

SAA

Our structures were used to rebuild part of a stage at the Singapore Aviation Academy in Changi. Steel  framing was used to replaced the original timber battens. This ensures a more durable and safer structure.

Read More »